Length of the rope is
ft.
Rope weighs
lb/ft.
Force exerted by the rope to lift it by
ft is
lb.
(a)
\Find the work done in pulling the rope to the top of the building.
\Therefore,
.
Work done as a Riemann sum is
.


lb-ft.
Work done required is
lb-ft.
(b)
\Find the work done in pulling half the rope to the top of the building.
\Therefore,
.
Set up the distance function for
ft of the rope pulled up.
Total length of the rope is
ft.
Distance function is
ft.
Work done as a Riemann sum is
.


Work done required is
lb-ft.
(a) Work done required is
lb-ft.
(b) Work done required is
lb-ft.